# Austria EPR report due date 2026

Last verified: November 4, 2026 · https://instica.com/epr/austria/deadlines

<a id="answer"></a>

Austria has 10 verified packaging EPR deadlines in the Instica data, reviewed on November 4, 2026, the first falling August 12, 2026. The kinds of date are registration deadline, other date, report deadline. Each carries the period it covers and a quoted source, and you sign and submit every filing yourself.

<a id="glance-intro"></a>

Austria has 10 verified deadlines in the Instica data. Verified means that the date or rule was read from a primary source on the retrieval date shown beside it, with the quote kept in the language of the source. A date that no primary source states is not shown as a date at all: it appears further down as not yet published, with the reason.

By shape, the entries are 2 with a fixed calendar date, 8 stated as a rule in words. The table lists them in date order, then by kind. The sections after it take each date in turn, then explain what the kinds of date ask of a producer, how to read a yearly rule or a month-only rule, and what to prepare before the day arrives.

<a id="glance"></a>

## Austria EPR deadlines at a glance

<a id="deadlines-table"></a>**Austria: verified deadlines, with kind, period and source**

| Date or rule | Kind | Period covered | Source |
| --- | --- | --- | --- |
| [January 1, 2023](#ar-appointment-2023-date) | [Registration deadline](#ar-appointment-2023-kind) | Not stated | [ris.bka.gv.at](https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902) |
| [Within two months of first putting household packaging on the market](#system-contract-2-months-rule) | [Registration deadline](#system-contract-2-months-kind) | Not stated | [ris.bka.gv.at](https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902) |
| [15 March following each calendar year](#annual-15-march-rule) | [Report](#annual-15-march-kind) | [preceding calendar year](#annual-15-march-period) | [ris.bka.gv.at](https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902) |
| [At least once a year, by 15 March](#carrier-bags-15-march-rule) | [Report](#carrier-bags-15-march-kind) | [preceding calendar year](#carrier-bags-15-march-period) | [ogd.ris.bka.gv.at](https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html) |
| [15 March following each calendar year](#recyclate-report-15-march-rule) | [Report](#recyclate-report-15-march-kind) | [preceding calendar year](#recyclate-report-15-march-period) | [ogd.ris.bka.gv.at](https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html) |
| [Within three months after each calendar year (by 31 March)](#reusable-only-annual-report-rule) | [Report](#reusable-only-annual-report-kind) | [preceding calendar year](#reusable-only-annual-report-period) | [ogd.ris.bka.gv.at](https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html) |
| [Within three months after each calendar year (by 31 March)](#self-importer-annual-report-rule) | [Report](#self-importer-annual-report-kind) | [preceding calendar year](#self-importer-annual-report-period) | [ogd.ris.bka.gv.at](https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html) |
| [End of a calendar quarter](#ar-change-quarter-end-rule) | [Other date](#ar-change-quarter-end-kind) | Not stated | [ogd.ris.bka.gv.at](https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html) |

<a id="dates"></a>

## Each verified date and what it asks of you

#### <a id="ev-ar-appointment-2023"></a>Registration deadline: January 1, 2023

[The registration deadline is January 1, 2023.](#ar-appointment-2023-date)

Note from the source: [Foreign distance sellers must have appointed a Bevollmächtigter for packaging put on the market from 1 Jan 2023.](#ar-appointment-2023-notes)

> haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten für ausländische Versandhändler zu bestellen
>
> Source: ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Language: de

#### <a id="ev-system-contract-2-months"></a>Registration deadline (2)

[The source states the rule as: within two months of first putting household packaging on the market.](#system-contract-2-months-rule)

Note from the source: [Primary obligated party concludes participation contract.](#system-contract-2-months-notes)

> binnen zwei Monaten
>
> Source: ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Language: de

#### <a id="ev-annual-15-march"></a>Report

[The source states the rule as: 15 March following each calendar year. It covers preceding calendar year.](#annual-15-march-rule)

Note from the source: [System participants report the mass of certain single-use plastic products; the system contract sets other reporting dates.](#annual-15-march-notes)

> spätestens bis zum 15. März des darauffolgenden Jahres
>
> Source: ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Language: de

#### <a id="ev-carrier-bags-15-march"></a>Report (2)

[The source states the rule as: at least once a year, by 15 March. It covers preceding calendar year.](#carrier-bags-15-march-rule)

Note from the source: [Manufacturers and importers of plastic carrier bags (AWG § 13g(1) Z 1) report the number of bags placed on the Austrian market in the previous calendar year, split into very lightweight and lightweight (from 0.015 mm), to the household-packaging system they are obliged to join.](#carrier-bags-15-march-notes)

> Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März,
>
> Source: ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html), Retrieved: November 4, 2026, Language: de

#### <a id="ev-recyclate-report-15-march"></a>Report (4)

[The source states the rule as: 15 March following each calendar year. It covers preceding calendar year.](#recyclate-report-15-march-rule)

Note from the source: [Household-packaging systems must oblige their participants to report the mass of recyclate used, per calendar year, to the system: for beverage bottles under the cited provisions (PET bottles first for 2023; single-use plastic beverage bottles first for 2028).](#recyclate-report-15-march-notes)

> spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden
>
> Source: ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html), Retrieved: November 4, 2026, Language: de

#### <a id="ev-reusable-only-annual-report"></a>Report (5)

[The source states the rule as: within three months after each calendar year (by 31 March). It covers preceding calendar year.](#reusable-only-annual-report-rule)

Note from the source: [Primary obligated parties (AWG § 13g) that place only reusable packaging on the market report the Anhang 3 Punkt 4 data electronically via the register under AWG § 22. First report for calendar year 2022.](#reusable-only-annual-report-notes)

> spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen.
>
> Source: ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html), Retrieved: November 4, 2026, Language: de

#### <a id="ev-self-importer-annual-report"></a>Report (6)

[The source states the rule as: within three months after each calendar year (by 31 March). It covers preceding calendar year.](#self-importer-annual-report-rule)

Note from the source: [Self-importers of household or commercial packaging that do not take part in a collection and recovery system send the Anhang 3 data to the ministry electronically via the register.](#self-importer-annual-report-notes)

> spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln
>
> Source: ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html), Retrieved: November 4, 2026, Language: de

#### <a id="ev-ar-change-quarter-end"></a>Other date (2)

[The source states the rule as: end of a calendar quarter.](#ar-change-quarter-end-rule)

Note from the source: [Appointing, changing or ending an authorised representative (Bevollmächtigter) for a foreign person takes effect only at the end of a calendar quarter. A foreign person may appoint only one authorised representative.](#ar-change-quarter-end-notes)

> Die Bestellung eines Bevollmächtigten sowie Änderungen oder die Beendigung einer Bevollmächtigung können nur mit Ablauf eines Kalenderquartals wirksam werden.
>
> Source: ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html), Retrieved: November 4, 2026, Language: de

<a id="dates-shared"></a>

## Dates the source shares with other places

<a id="deadlines-table-shared"></a>**Austria: verified deadlines, with kind, period and source**

| Date or rule | Kind | Period covered | Source |
| --- | --- | --- | --- |
| [August 12, 2026](#ppwr-application-date) | [Other date](#ppwr-application-kind) | Not stated | [eur-lex.europa.eu](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng) |
| [1 June each year, for the preceding full calendar year](#ppwr-annex-ix-annual-rule) | [Report](#ppwr-annex-ix-annual-kind) | Not stated | [eur-lex.europa.eu](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng) |

#### <a id="ev-ppwr-application"></a>Other date: August 12, 2026

[The other date is August 12, 2026.](#ppwr-application-date)

Note from the source: [Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it.](#ppwr-application-notes)

> It shall apply from 12 August 2026.
>
> Source: eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Language: en

#### <a id="ev-ppwr-annex-ix-annual"></a>Report (3)

[The source states the rule as: 1 June each year, for the preceding full calendar year.](#ppwr-annex-ix-annual-rule)

Note from the source: [PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending.](#ppwr-annex-ix-annual-notes)

> by 1 June for each full preceding calendar year
>
> Source: eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Language: en

<a id="region"></a>

## Austria next to the other places in Europe

Austria is one of 30 places in Europe with a verified deadline in the Instica data. With 10 verified deadlines it ranks 1 of 30 by the number of entries (rank 1 has the most). By the first dated entry in 2026, August 12, 2026, it ranks 17 of 30, sharing that day with 12 other places.

In Europe the earliest first date in 2026 belongs to Norway (January 22, 2026) and the latest to Germany (December 31, 2026).

Closest in time to the first date of Austria, measured against the other places in Europe: Belgium (August 12, 2026, the same day); Bulgaria (August 12, 2026, the same day); Cyprus (August 12, 2026, the same day).

Neighbours on the map that have a dated entry in 2026, compared with the first date of Austria: Switzerland (February 28, 2026, 165 days earlier); Czechia (August 12, 2026, the same day); Germany (December 31, 2026, 141 days later); Hungary (August 12, 2026, the same day).

Across all 48 places with a verified deadline in the Instica data, whatever the region, 10 entries for Austria sits against a median of 3 per place, and 47 places have fewer. The first dated entry of Austria in 2026, August 12, 2026, ranks 31 of 45 places with a dated entry, level with 12 others; the earliest anywhere is Colorado (January 1, 2026) and the latest is Germany (December 31, 2026).

<a id="kind-compare"></a>

## Austria: each kind of date against Europe

Each kind of date that Austria has in 2026 is set below against the other places in Europe that have a dated entry of the same kind. The rank counts places with an earlier date, so rank 1 is the earliest.

Other date: Austria has August 12, 2026. Of the 26 places in Europe with a dated other date in 2026, it ranks 1. The earliest is Austria (August 12, 2026) and the latest is Slovakia (August 12, 2026).

<a id="kinds"></a>

## What each kind of date means

#### <a id="kind-registration"></a>Registration deadline

A registration deadline is the date by which a producer has to be on the register, or signed up with the programme, before it places covered packaging on the market. Who has to register depends on the place: it is often the brand owner, the importer or the marketplace, and the quote under each date shows the wording. Instica reads the date from the source and shows it beside the period it opens. The registration itself is something you do in the official registry.

#### <a id="kind-other"></a>Other date

Some dates in the source are neither a registration, a report nor a payment, for example a date from which a rule applies or a notice period. They are listed with the same source and quote as every other date, and the note beside each one says what it is.

#### <a id="kind-report"></a>Report

A report deadline is the date by which the packaging quantities for a stated period have to reach the receiving office or programme. The period covered is shown with the date, because the same report can be due a few months after the period ends. Instica measures and estimates the weights, prepares the file in the layout of the recipient and shows you the numbers; you sign and submit it in the official portal.

<a id="reading"></a>

## How dates, yearly rules and month-only rules read

A fixed date is shown as the source gives it, formatted for your language. It is a calendar day, not a time of day, and it applies in the local time of the office that receives the filing. Where a fixed date is the first of a yearly series, the entry says so.

A rule stated in words, for example a number of months after first placing packaging on the market, depends on a date that only you know. The wording is shown as the source gives it, and the entry stays out of the calendar feed.

Dates in this data can be revised by the programme or the authority. Each entry shows the day it was retrieved, so you can see how old it is, and a newer source always wins over this page.

<a id="open"></a>

## Dates the sources have not published yet

Austria: the data lists no entry that is still pending. Every deadline above is verified.

<a id="who"></a>

## Who sets and receives these dates

Austria: Registration runs through [Register nach § 22 AWG 2002 (Bevollmächtigter entry) and contract with an approved collection and recycling system](#registry); the party that registers is described as [The Austrian Bevollmächtigter registers for the foreign distance seller; a primary obligated party concludes a participation contract with a system within two months of first putting household packaging on the market](#who-registers). The dates above are the ones that registry and its programme publish, so they are the ones your filings are measured against.

Producers meet the duty through [one of several producer responsibility organisations](#organisation-model); the organisations named in the data are [Altstoff Recycling Austria AG (ARA)](#organisation-names); membership of the organisation is required. Programmes can publish their own dates, such as invoice days, next to the dates of the authority, and both kinds of date are listed when a source states them.

<a id="file"></a>

## The file that goes with the date

Austria: the recipient has not yet published a file layout for these reports, so the data holds no layout to show. Instica does not fill the gap with a guess; the report-format page records what is still open. When the layout is published, Instica prepares the file in it from your measured and estimated quantities, and you upload it yourself.

Open the Austria report-format page

<a id="prepare"></a>

## Preparing before the date

1. Check whether you have to register at all, and with whom, before the registration date arrives; the first report cannot be filed without it.
2. Count the packaging you place on the market in the period the date covers. Weigh a sample of each pack, record the material of each part and note where each weight comes from: measured, supplied by your supplier, estimated or declared.
3. Group the weights the way the recipient groups them. The report-format page for this place lists the columns, the units and the rounding the file expects.
4. Estimate the fee from the published rate schedule, if the programme charges by weight or material, and keep the working so you can explain every figure.
5. Read the source quote under the date once more, because the programme can change a day or a period between reviews.
6. Sign in to the official portal yourself, check the prepared file and submit it. Instica stores no portal credentials and files nothing for you.

<a id="calendar"></a>

## Add these dates to your calendar

2 of the 10 verified dates for Austria have a day in the source and are in the calendar feed. Subscribe once and your calendar adds new dates after each review. Every event carries the source address of the date, so you can open the page the date comes from. Entries without a day stay on this page.

Interactive tool: Deadline calendar feed (ICS) (works on the web page)

<a id="faq"></a>

## Questions about Austria EPR deadlines

### <a id="faq-1"></a>When is the Austria EPR report due?

The data lists these report dates for Austria: 15 March following each calendar year; At least once a year, by 15 March; 1 June each year, for the preceding full calendar year; 15 March following each calendar year; Within three months after each calendar year (by 31 March); Within three months after each calendar year (by 31 March). Read the period each one covers in the table above, and open the source to confirm the day before you file.

### <a id="faq-2"></a>Which period does a Austria deadline cover?

The sources describe these periods: preceding calendar year. A report is usually filed after the period it covers ends, so the date and the period are different things and both are shown.

<a id="faq-general"></a>

## Frequently asked questions

### <a id="faq-1-question"></a>Does Instica submit the report for me?

No. Instica measures, estimates and prepares the figures and the file. You sign in to the official portal, check the file and submit it yourself, and Instica never stores your portal credentials.

### <a id="faq-2-question"></a>How do I add the Austria dates to my calendar?

Use the calendar block on this page: download the file or subscribe with the feed address. Each event has the day, the kind of date and the address of the source. Dates that the source gives only as a month or in words are not in the feed.

### <a id="faq-3"></a>What if a source changes a date after this review?

The source wins. Every entry shows the day it was retrieved. Check the source address before you act, and use the next review of this page for the change.

<a id="estimate"></a>

## How to read this page

> **Estimate**: Instica measures, estimates and prepares. Every date and layout on this page comes from the source named beside it and is shown as published on the retrieval date; it can change, so check the source before you act. You sign and submit each report yourself in the regulator or programme portal. Instica stores no portal credentials and files nothing for you. This page is information, not legal advice.

<a id="epr-cite-facts"></a>

## Facts on this page

Each fact is a self-contained sentence with its source. Link to a fact with its anchor.

- <a id="ar-appointment-2023-kind"></a>Austria: the source at ris.bka.gv.at lists a registration deadline. [#ar-appointment-2023-kind](#ar-appointment-2023-kind)
  Value: registration · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten für ausländische Versandhändler zu bestellen (de)
- <a id="ar-appointment-2023-date"></a>Austria: the registration deadline is January 1, 2023 (ris.bka.gv.at, retrieved September 29, 2026). [#ar-appointment-2023-date](#ar-appointment-2023-date)
  Value: January 1, 2023 · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten für ausländische Versandhändler zu bestellen (de)
- <a id="ar-appointment-2023-notes"></a>Austria: the source notes for the registration deadline: Foreign distance sellers must have appointed a Bevollmächtigter for packaging put on the market from 1 Jan 2023. (ris.bka.gv.at). [#ar-appointment-2023-notes](#ar-appointment-2023-notes)
  Value: Foreign distance sellers must have appointed a Bevollmächtigter for packaging put on the market from 1 Jan 2023. · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten für ausländische Versandhändler zu bestellen (de)
- <a id="ppwr-application-kind"></a>Austria: the source at eur-lex.europa.eu lists a date of another kind. [#ppwr-application-kind](#ppwr-application-kind)
  Value: other · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="ppwr-application-date"></a>Austria: the other date is August 12, 2026 (eur-lex.europa.eu, retrieved September 29, 2026). [#ppwr-application-date](#ppwr-application-date)
  Value: August 12, 2026 · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="ppwr-application-notes"></a>Austria: the source notes for the other date: Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it. (eur-lex.europa.eu). [#ppwr-application-notes](#ppwr-application-notes)
  Value: Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it. · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="system-contract-2-months-kind"></a>Austria: the source at ris.bka.gv.at lists a registration deadline. [#system-contract-2-months-kind](#system-contract-2-months-kind)
  Value: registration · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: binnen zwei Monaten (de)
- <a id="system-contract-2-months-rule"></a>Austria: the registration deadline follows this rule: within two months of first putting household packaging on the market (ris.bka.gv.at, retrieved September 29, 2026). [#system-contract-2-months-rule](#system-contract-2-months-rule)
  Value: within two months of first putting household packaging on the market · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: binnen zwei Monaten (de)
- <a id="system-contract-2-months-notes"></a>Austria: the source notes for the registration deadline: Primary obligated party concludes participation contract. (ris.bka.gv.at). [#system-contract-2-months-notes](#system-contract-2-months-notes)
  Value: Primary obligated party concludes participation contract. · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: binnen zwei Monaten (de)
- <a id="annual-15-march-kind"></a>Austria: the source at ris.bka.gv.at lists a report deadline. [#annual-15-march-kind](#annual-15-march-kind)
  Value: report · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres (de)
- <a id="annual-15-march-rule"></a>Austria: the report deadline follows this rule: 15 March following each calendar year (ris.bka.gv.at, retrieved September 29, 2026). [#annual-15-march-rule](#annual-15-march-rule)
  Value: 15 March following each calendar year · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres (de)
- <a id="annual-15-march-period"></a>Austria: the report deadline covers preceding calendar year (ris.bka.gv.at). [#annual-15-march-period](#annual-15-march-period)
  Value: preceding calendar year · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres (de)
- <a id="annual-15-march-notes"></a>Austria: the source notes for the report deadline: System participants report the mass of certain single-use plastic products; the system contract sets other reporting dates. (ris.bka.gv.at). [#annual-15-march-notes](#annual-15-march-notes)
  Value: System participants report the mass of certain single-use plastic products; the system contract sets other reporting dates. · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres (de)
- <a id="carrier-bags-15-march-kind"></a>Austria: the source at ogd.ris.bka.gv.at lists a report deadline. [#carrier-bags-15-march-kind](#carrier-bags-15-march-kind)
  Value: report · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März, (de)
- <a id="carrier-bags-15-march-rule"></a>Austria: the report deadline follows this rule: at least once a year, by 15 March (ogd.ris.bka.gv.at, retrieved November 4, 2026). [#carrier-bags-15-march-rule](#carrier-bags-15-march-rule)
  Value: at least once a year, by 15 March · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März, (de)
- <a id="carrier-bags-15-march-period"></a>Austria: the report deadline covers preceding calendar year (ogd.ris.bka.gv.at). [#carrier-bags-15-march-period](#carrier-bags-15-march-period)
  Value: preceding calendar year · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März, (de)
- <a id="carrier-bags-15-march-notes"></a>Austria: the source notes for the report deadline: Manufacturers and importers of plastic carrier bags (AWG § 13g(1) Z 1) report the number of bags placed on the Austrian market in the previous calendar year, split into very lightweight and lightweight (from 0.015 mm), to the household-packaging system they are obliged to join. (ogd.ris.bka.gv.at). [#carrier-bags-15-march-notes](#carrier-bags-15-march-notes)
  Value: Manufacturers and importers of plastic carrier bags (AWG § 13g(1) Z 1) report the number of bags placed on the Austrian market in the previous calendar year, split into very lightweight and lightweight (from 0.015 mm), to the household-packaging system they are obliged to join. · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März, (de)
- <a id="ppwr-annex-ix-annual-kind"></a>Austria: the source at eur-lex.europa.eu lists a report deadline. [#ppwr-annex-ix-annual-kind](#ppwr-annex-ix-annual-kind)
  Value: report · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="ppwr-annex-ix-annual-rule"></a>Austria: the report deadline follows this rule: 1 June each year, for the preceding full calendar year (eur-lex.europa.eu, retrieved September 29, 2026). [#ppwr-annex-ix-annual-rule](#ppwr-annex-ix-annual-rule)
  Value: 1 June each year, for the preceding full calendar year · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="ppwr-annex-ix-annual-notes"></a>Austria: the source notes for the report deadline: PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending. (eur-lex.europa.eu). [#ppwr-annex-ix-annual-notes](#ppwr-annex-ix-annual-notes)
  Value: PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending. · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="recyclate-report-15-march-kind"></a>Austria: the source at ogd.ris.bka.gv.at lists a report deadline. [#recyclate-report-15-march-kind](#recyclate-report-15-march-kind)
  Value: report · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden (de)
- <a id="recyclate-report-15-march-rule"></a>Austria: the report deadline follows this rule: 15 March following each calendar year (ogd.ris.bka.gv.at, retrieved November 4, 2026). [#recyclate-report-15-march-rule](#recyclate-report-15-march-rule)
  Value: 15 March following each calendar year · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden (de)
- <a id="recyclate-report-15-march-period"></a>Austria: the report deadline covers preceding calendar year (ogd.ris.bka.gv.at). [#recyclate-report-15-march-period](#recyclate-report-15-march-period)
  Value: preceding calendar year · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden (de)
- <a id="recyclate-report-15-march-notes"></a>Austria: the source notes for the report deadline: Household-packaging systems must oblige their participants to report the mass of recyclate used, per calendar year, to the system: for beverage bottles under the cited provisions (PET bottles first for 2023; single-use plastic beverage bottles first for 2028). (ogd.ris.bka.gv.at). [#recyclate-report-15-march-notes](#recyclate-report-15-march-notes)
  Value: Household-packaging systems must oblige their participants to report the mass of recyclate used, per calendar year, to the system: for beverage bottles under the cited provisions (PET bottles first for 2023; single-use plastic beverage bottles first for 2028). · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden (de)
- <a id="reusable-only-annual-report-kind"></a>Austria: the source at ogd.ris.bka.gv.at lists a report deadline. [#reusable-only-annual-report-kind](#reusable-only-annual-report-kind)
  Value: report · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen. (de)
- <a id="reusable-only-annual-report-rule"></a>Austria: the report deadline follows this rule: within three months after each calendar year (by 31 March) (ogd.ris.bka.gv.at, retrieved November 4, 2026). [#reusable-only-annual-report-rule](#reusable-only-annual-report-rule)
  Value: within three months after each calendar year (by 31 March) · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen. (de)
- <a id="reusable-only-annual-report-period"></a>Austria: the report deadline covers preceding calendar year (ogd.ris.bka.gv.at). [#reusable-only-annual-report-period](#reusable-only-annual-report-period)
  Value: preceding calendar year · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen. (de)
- <a id="reusable-only-annual-report-notes"></a>Austria: the source notes for the report deadline: Primary obligated parties (AWG § 13g) that place only reusable packaging on the market report the Anhang 3 Punkt 4 data electronically via the register under AWG § 22. First report for calendar year 2022. (ogd.ris.bka.gv.at). [#reusable-only-annual-report-notes](#reusable-only-annual-report-notes)
  Value: Primary obligated parties (AWG § 13g) that place only reusable packaging on the market report the Anhang 3 Punkt 4 data electronically via the register under AWG § 22. First report for calendar year 2022. · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen. (de)
- <a id="self-importer-annual-report-kind"></a>Austria: the source at ogd.ris.bka.gv.at lists a report deadline. [#self-importer-annual-report-kind](#self-importer-annual-report-kind)
  Value: report · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln (de)
- <a id="self-importer-annual-report-rule"></a>Austria: the report deadline follows this rule: within three months after each calendar year (by 31 March) (ogd.ris.bka.gv.at, retrieved November 4, 2026). [#self-importer-annual-report-rule](#self-importer-annual-report-rule)
  Value: within three months after each calendar year (by 31 March) · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln (de)
- <a id="self-importer-annual-report-period"></a>Austria: the report deadline covers preceding calendar year (ogd.ris.bka.gv.at). [#self-importer-annual-report-period](#self-importer-annual-report-period)
  Value: preceding calendar year · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln (de)
- <a id="self-importer-annual-report-notes"></a>Austria: the source notes for the report deadline: Self-importers of household or commercial packaging that do not take part in a collection and recovery system send the Anhang 3 data to the ministry electronically via the register. (ogd.ris.bka.gv.at). [#self-importer-annual-report-notes](#self-importer-annual-report-notes)
  Value: Self-importers of household or commercial packaging that do not take part in a collection and recovery system send the Anhang 3 data to the ministry electronically via the register. · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln (de)
- <a id="ar-change-quarter-end-kind"></a>Austria: the source at ogd.ris.bka.gv.at lists a date of another kind. [#ar-change-quarter-end-kind](#ar-change-quarter-end-kind)
  Value: other · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Die Bestellung eines Bevollmächtigten sowie Änderungen oder die Beendigung einer Bevollmächtigung können nur mit Ablauf eines Kalenderquartals wirksam werden. (de)
- <a id="ar-change-quarter-end-rule"></a>Austria: the other date follows this rule: end of a calendar quarter (ogd.ris.bka.gv.at, retrieved November 4, 2026). [#ar-change-quarter-end-rule](#ar-change-quarter-end-rule)
  Value: end of a calendar quarter · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Die Bestellung eines Bevollmächtigten sowie Änderungen oder die Beendigung einer Bevollmächtigung können nur mit Ablauf eines Kalenderquartals wirksam werden. (de)
- <a id="ar-change-quarter-end-notes"></a>Austria: the source notes for the other date: Appointing, changing or ending an authorised representative (Bevollmächtigter) for a foreign person takes effect only at the end of a calendar quarter. A foreign person may appoint only one authorised representative. (ogd.ris.bka.gv.at). [#ar-change-quarter-end-notes](#ar-change-quarter-end-notes)
  Value: Appointing, changing or ending an authorised representative (Bevollmächtigter) for a foreign person takes effect only at the end of a calendar quarter. A foreign person may appoint only one authorised representative. · Source: https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html · Retrieved: November 4, 2026 · Status: verified
  Verbatim quote: Die Bestellung eines Bevollmächtigten sowie Änderungen oder die Beendigung einer Bevollmächtigung können nur mit Ablauf eines Kalenderquartals wirksam werden. (de)
- <a id="registry"></a>Austria: producers register with Register nach § 22 AWG 2002 (Bevollmächtigter entry) and contract with an approved collection and recycling system. [#registry](#registry)
  Value: Register nach § 22 AWG 2002 (Bevollmächtigter entry) and contract with an approved collection and recycling system · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Registrierung als Bevollmächtigter im Register gemäß § 22 Abs. 1 AWG 2002 unter Angabe (de)
- <a id="who-registers"></a>Austria: the party that registers is described as The Austrian Bevollmächtigter registers for the foreign distance seller; a primary obligated party concludes a participation contract with a system within two months of first putting household packaging on the market. [#who-registers](#who-registers)
  Value: The Austrian Bevollmächtigter registers for the foreign distance seller; a primary obligated party concludes a participation contract with a system within two months of first putting household packaging on the market · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Registrierung als Bevollmächtigter im Register gemäß § 22 Abs. 1 AWG 2002 unter Angabe (de)
- <a id="registration-renewal"></a>Austria: registration renewal is described as Participation declaration at least annually or on a material change. [#registration-renewal](#registration-renewal)
  Value: Participation declaration at least annually or on a material change · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Registrierung als Bevollmächtigter im Register gemäß § 22 Abs. 1 AWG 2002 unter Angabe (de)
- <a id="registration-identifier"></a>Austria: registration yields an identifier called Register entry under § 22 AWG 2002. [#registration-identifier](#registration-identifier)
  Value: Register entry under § 22 AWG 2002 · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Registrierung als Bevollmächtigter im Register gemäß § 22 Abs. 1 AWG 2002 unter Angabe (de)
- <a id="organisation-model"></a>Austria: producers meet the duty through one of several producer responsibility organisations. [#organisation-model](#organisation-model)
  Value: several competing organisations · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Bevollmächtigte ist eine natürliche oder juristische Person mit Sitz im Inland. (de)
- <a id="organisation-names"></a>Austria: the organisations named in the data are Altstoff Recycling Austria AG (ARA). [#organisation-names](#organisation-names)
  Value: Altstoff Recycling Austria AG (ARA) · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Bevollmächtigte ist eine natürliche oder juristische Person mit Sitz im Inland. (de)
- <a id="organisation-membership"></a>Austria: membership of the organisation is required. [#organisation-membership](#organisation-membership)
  Value: yes · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Bevollmächtigte ist eine natürliche oder juristische Person mit Sitz im Inland. (de)
- <a id="format-pending"></a>Austria: the report file layout is not yet published, reason: The sources read describe the obligation but not a declaration file layout (columns, codes, units): no downloadable template or documented upload format was found. The worksheet in this file is Instica's own working layout, not the recipient's. [#format-pending](#format-pending)
  Value: not yet published · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: September 30, 2026 · Status: not yet published
  Verbatim quote: haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten (de)
- <a id="deadline-count"></a>Austria: 10 verified deadlines in the bundle (reviewed November 4, 2026). [#deadline-count](#deadline-count)
  Value: 10 · Source: https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902 · Retrieved: November 4, 2026 · Status: verified

## Related pages

### Explore packaging EPR

- [Packaging EPR europe](https://instica.com/epr/europe)

### More for this jurisdiction

- [Austria EPR fee schedule 2026](https://instica.com/epr/austria/fees/2026)
- [Do I owe EPR fees Austria](https://instica.com/epr/austria/do-i-owe)
- [Austria EPR fee calculator](https://instica.com/epr/austria/fee-calculator)
- [Sell on Amazon EPR Austria](https://instica.com/epr/for/amazon/austria)
- [Aluminium extended producer responsibility Austria](https://instica.com/epr/austria/updates)
- [Bottles EPR fees Austria](https://instica.com/epr/bottle/austria)
- [Jars packaging EPR Austria](https://instica.com/epr/jar/austria)
- [Mailers packaging EPR Austria](https://instica.com/epr/mailer/austria)
- [Austria plastic fee rate](https://instica.com/epr/austria/fees/2026/plastic)

### Related pages

- [Belgium packaging report template](https://instica.com/epr/belgium/deadlines)
- [British Columbia EPR](https://instica.com/epr/british-columbia/deadlines)
- [Aluminium extended producer responsibility Bulgaria](https://instica.com/epr/bulgaria/deadlines)
- [Amazon packaging EPR California fees](https://instica.com/epr/california/deadlines)
- [Colorado EPR legislation](https://instica.com/epr/colorado/deadlines)
- [EPR deadlines 2025](https://instica.com/epr/deadlines)

## Sources

1. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Status: verified
   > haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten für ausländische Versandhändler zu bestellen (de)
2. eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Status: verified
   > It shall apply from 12 August 2026. (en)
3. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Status: verified
   > binnen zwei Monaten (de)
4. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Status: verified
   > spätestens bis zum 15. März des darauffolgenden Jahres (de)
5. ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40239316/NOR40239316.html), Retrieved: November 4, 2026, Status: verified
   > Hersteller und Importeure von Kunststofftragetaschen (§ 13g Abs. 1 Z 1) haben zumindest einmal jährlich, spätestens bis zum 15. März, (de)
6. eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Status: verified
   > by 1 June for each full preceding calendar year (en)
7. ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255807/NOR40255807.html), Retrieved: November 4, 2026, Status: verified
   > spätestens bis zum 15. März des darauffolgenden Jahres, die Masse des eingesetzten Recyclats an das Sammel- und Verwertungssystem zu melden (de)
8. ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40255803/NOR40255803.html), Retrieved: November 4, 2026, Status: verified
   > spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr zu melden. Diese Meldung hat erstmals für das Kalenderjahr 2022 zu erfolgen. (de)
9. ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240496/NOR40240496.html), Retrieved: November 4, 2026, Status: verified
   > spätestens drei Monate nach Ablauf jedes Kalenderjahres für das vorangegangene Kalenderjahr elektronisch im Wege des Registers zu übermitteln (de)
10. ogd.ris.bka.gv.at (https://ogd.ris.bka.gv.at/Dokumente/Bundesnormen/NOR40240515/NOR40240515.html), Retrieved: November 4, 2026, Status: verified
   > Die Bestellung eines Bevollmächtigten sowie Änderungen oder die Beendigung einer Bevollmächtigung können nur mit Ablauf eines Kalenderquartals wirksam werden. (de)
11. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Status: verified
   > Registrierung als Bevollmächtigter im Register gemäß § 22 Abs. 1 AWG 2002 unter Angabe (de)
12. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 29, 2026, Status: verified
   > Bevollmächtigte ist eine natürliche oder juristische Person mit Sitz im Inland. (de)
13. ris.bka.gv.at (https://www.ris.bka.gv.at/GeltendeFassung.wxe?Abfrage=Bundesnormen&Gesetzesnummer=20008902), Retrieved: September 30, 2026, Status: not yet published
   > haben für ab dem 1. Jänner 2023 in Österreich in Verkehr gesetzte Verpackungen einen Bevollmächtigten (de)

## Cite this page

Instica, “Austria EPR report due date 2026”, https://instica.com/epr/austria/deadlines, last verified 2026-11-04, dataset v1-281284b7e7c1, CC-BY-4.0.

- Canonical URL: https://instica.com/epr/austria/deadlines
- Last verified: November 4, 2026
- Last changed: November 4, 2026
- Dataset version: v1-281284b7e7c1
- Licence: Reuse is allowed under CC-BY-4.0 with credit to Instica and a link to this page.
- Machine-readable versions: https://instica.com/epr/austria/deadlines.md · https://instica.com/epr/austria/deadlines.json
