# Belgium EPR 2027

Last verified: September 30, 2026 · https://instica.com/epr/belgium/deadlines

<a id="answer"></a>

Belgium has 5 verified packaging EPR deadlines in the Instica data, reviewed on September 29, 2026, the first falling August 12, 2026. The kinds of date are registration deadline, other date, report deadline. Each carries the period it covers and a quoted source, and you sign and submit every filing yourself.

<a id="glance-intro"></a>

Belgium has 5 verified deadlines in the Instica data. Verified means that the date or rule was read from a primary source on the retrieval date shown beside it, with the quote kept in the language of the source. A date that no primary source states is not shown as a date at all: it appears further down as not yet published, with the reason.

By shape, the entries are 3 with a fixed calendar date, 2 stated as a rule in words. The table lists them in date order, then by kind. The sections after it take each date in turn, then explain what the kinds of date ask of a producer, how to read a yearly rule or a month-only rule, and what to prepare before the day arrives.

<a id="glance"></a>

## Belgium EPR deadlines at a glance

<a id="deadlines-table"></a>**Belgium: verified deadlines, with kind, period and source**

| Date or rule | Kind | Period covered | Source |
| --- | --- | --- | --- |
| [September 15, 2026](#declaration-amend-2025-date) | [Other date](#declaration-amend-2025-kind) | Not stated | [fostplus.be](https://www.fostplus.be/en/members/declaration) |
| [28 February for packaging put on the market the previous year](#annual-declaration-rule) | [Report](#annual-declaration-kind) | [previous calendar year](#annual-declaration-period) | [fostplus.be](https://www.fostplus.be/en/members/declaration) |

<a id="dates"></a>

## Each verified date and what it asks of you

#### <a id="ev-declaration-amend-2025"></a>Other date: September 15, 2026 (2)

[The other date is September 15, 2026.](#declaration-amend-2025-date)

Note from the source: [Exceptional window to amend the 2025 declaration.](#declaration-amend-2025-notes)

> Exceptionally, you can still amend your 2025 declaration until 15 September this year.
>
> Source: fostplus.be (https://www.fostplus.be/en/members/declaration), Retrieved: September 29, 2026, Language: en

#### <a id="ev-annual-declaration"></a>Report

[The source states the rule as: 28 February for packaging put on the market the previous year. It covers previous calendar year.](#annual-declaration-rule)

Note from the source: [Declaration via the MyFost portal.](#annual-declaration-notes)

> The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year.
>
> Source: fostplus.be (https://www.fostplus.be/en/members/declaration), Retrieved: September 29, 2026, Language: en

<a id="dates-shared"></a>

## Dates the source shares with other places

<a id="deadlines-table-shared"></a>**Belgium: verified deadlines, with kind, period and source**

| Date or rule | Kind | Period covered | Source |
| --- | --- | --- | --- |
| [August 12, 2026](#ppwr-authorised-representative-date) | [Registration deadline](#ppwr-authorised-representative-kind) | Not stated | [eur-lex.europa.eu](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng) |
| [August 12, 2026](#ppwr-application-date) | [Other date](#ppwr-application-kind) | Not stated | [eur-lex.europa.eu](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng) |
| [1 June each year, for the preceding full calendar year](#ppwr-annex-ix-annual-rule) | [Report](#ppwr-annex-ix-annual-kind) | Not stated | [eur-lex.europa.eu](https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng) |

#### <a id="ev-ppwr-authorised-representative"></a>Registration deadline: August 12, 2026

[The registration deadline is August 12, 2026.](#ppwr-authorised-representative-date)

Note from the source: [PPWR Art 45(3): a producer selling directly to end users in another Member State (Art 3(1)(15)(c),(d)) must appoint an authorised representative for EPR in each Member State where it first makes packaging available, other than its own. Registration also required (Art 44(2),(4)). Instica never acts as authorised representative.](#ppwr-authorised-representative-notes)

> shall appoint, by written mandate, an authorised representative for the extended producer responsibility in each Member State where
>
> Source: eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Language: en

#### <a id="ev-ppwr-application"></a>Other date: August 12, 2026

[The other date is August 12, 2026.](#ppwr-application-date)

Note from the source: [Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it.](#ppwr-application-notes)

> It shall apply from 12 August 2026.
>
> Source: eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Language: en

#### <a id="ev-ppwr-annex-ix-annual"></a>Report (2)

[The source states the rule as: 1 June each year, for the preceding full calendar year.](#ppwr-annex-ix-annual-rule)

Note from the source: [PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending.](#ppwr-annex-ix-annual-notes)

> by 1 June for each full preceding calendar year
>
> Source: eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Language: en

<a id="calc"></a>

## Belgium: the 2026 calendar worked out day by day

This section places the 3 dated entries for Belgium on the 2026 calendar. A yearly rule is placed on its day in 2026; a fixed date is used as the source gives it. The weekday, the day of the year, the ISO week and the quarter are worked out from that date, and the distance to the review of September 29, 2026 is counted in days. The first entry falls on August 12, 2026 and the last on September 15, 2026.

Registration deadline: Wednesday, August 12, 2026. This is day 224 of the year, in ISO week 33 and quarter 3. It lay 48 days before the review date, and it is the first entry of the year.

Other date: Wednesday, August 12, 2026. This is day 224 of the year, in ISO week 33 and quarter 3. It lay 48 days before the review date, on the same day as the previous entry (registration deadline).

Other date: Tuesday, September 15, 2026. This is day 258 of the year, in ISO week 38 and quarter 3. It lay 14 days before the review date, and 34 days after the previous entry (other date).

Across 2026 the 3 dated entries for Belgium spread over 34 days, from the first to the last. By quarter the count is Q1 0, Q2 0, Q3 3, Q4 0.

The longest wait between two entries is 34 days, from August 12, 2026 to September 15, 2026. 1 entry shares its day with the entry before. None of the 3 dates falls on a Saturday or Sunday in 2026.

By kind, the 2026 entries for Belgium are Registration deadline 1, Other date 2. By weekday they are Wednesday 2, Tuesday 1. Counted from the review on September 29, 2026, the first entry falls 48 days before it and the last 14 days before it.

<a id="region"></a>

## Belgium next to the other places in Europe

Belgium is one of 30 places in Europe with a verified deadline in the Instica data. With 5 verified deadlines it ranks 4 of 30 by the number of entries (rank 1 has the most). By the first dated entry in 2026, August 12, 2026, it ranks 17 of 30, sharing that day with 12 other places.

In Europe the earliest first date in 2026 belongs to Norway (January 22, 2026) and the latest to Germany (December 31, 2026).

Closest in time to the first date of Belgium, measured against the other places in Europe: Austria (August 12, 2026, the same day); Bulgaria (August 12, 2026, the same day); Cyprus (August 12, 2026, the same day).

Neighbours on the map that have a dated entry in 2026, compared with the first date of Belgium: Germany (December 31, 2026, 141 days later); France (August 12, 2026, the same day); Luxembourg (June 1, 2026, 72 days earlier); Netherlands (June 1, 2026, 72 days earlier).

Across all 48 places with a verified deadline in the Instica data, whatever the region, 5 entries for Belgium sits against a median of 3 per place, and 36 places have fewer. The first dated entry of Belgium in 2026, August 12, 2026, ranks 31 of 45 places with a dated entry, level with 12 others; the earliest anywhere is Colorado (January 1, 2026) and the latest is Germany (December 31, 2026).

<a id="kind-compare"></a>

## Belgium: each kind of date against Europe

Each kind of date that Belgium has in 2026 is set below against the other places in Europe that have a dated entry of the same kind. The rank counts places with an earlier date, so rank 1 is the earliest.

Registration deadline: Belgium has August 12, 2026. Of the 12 places in Europe with a dated registration deadline in 2026, it ranks 1. The earliest is Belgium (August 12, 2026) and the latest is Ireland (August 12, 2026).

Other date: Belgium has August 12, 2026. Of the 26 places in Europe with a dated other date in 2026, it ranks 1. The earliest is Austria (August 12, 2026) and the latest is Slovakia (August 12, 2026).

<a id="months"></a>

## Belgium: the 2026 dates month by month

Month by month, the dated entries for Belgium in 2026 fall as follows. No entry falls in January, February, March, April, May, June, July, October, November, December.

August: Registration deadline on Wednesday the 12th; Other date on Wednesday the 12th.

September: Other date on Tuesday the 15th.

<a id="kinds"></a>

## What each kind of date means

#### <a id="kind-registration"></a>Registration deadline

A registration deadline is the date by which a producer has to be on the register, or signed up with the programme, before it places covered packaging on the market. Who has to register depends on the place: it is often the brand owner, the importer or the marketplace, and the quote under each date shows the wording. Instica reads the date from the source and shows it beside the period it opens. The registration itself is something you do in the official registry.

#### <a id="kind-other"></a>Other date

Some dates in the source are neither a registration, a report nor a payment, for example a date from which a rule applies or a notice period. They are listed with the same source and quote as every other date, and the note beside each one says what it is.

#### <a id="kind-report"></a>Report

A report deadline is the date by which the packaging quantities for a stated period have to reach the receiving office or programme. The period covered is shown with the date, because the same report can be due a few months after the period ends. Instica measures and estimates the weights, prepares the file in the layout of the recipient and shows you the numbers; you sign and submit it in the official portal.

<a id="reading"></a>

## How dates, yearly rules and month-only rules read

A fixed date is shown as the source gives it, formatted for your language. It is a calendar day, not a time of day, and it applies in the local time of the office that receives the filing. Where a fixed date is the first of a yearly series, the entry says so.

A rule stated in words, for example a number of months after first placing packaging on the market, depends on a date that only you know. The wording is shown as the source gives it, and the entry stays out of the calendar feed.

Dates in this data can be revised by the programme or the authority. Each entry shows the day it was retrieved, so you can see how old it is, and a newer source always wins over this page.

<a id="open"></a>

## Dates the sources have not published yet

Belgium: the data lists no entry that is still pending. Every deadline above is verified.

<a id="who"></a>

## Who sets and receives these dates

Belgium: Registration runs through [EPRiBEL producer register (formerly IVC-CIE); Fost Plus registers members collectively](#registry); the party that registers is described as [Members: Fost Plus on their behalf; non-members register directly through EPRiBEL](#who-registers). The dates above are the ones that registry and its programme publish, so they are the ones your filings are measured against.

Producers meet the duty through [one of several producer responsibility organisations](#organisation-model); the organisations named in the data are [Fost Plus (household), Valipac (industrial)](#organisation-names); membership of an organisation is not required. Programmes can publish their own dates, such as invoice days, next to the dates of the authority, and both kinds of date are listed when a source states them.

<a id="file"></a>

## The file that goes with the date

Belgium: the recipient has not yet published a file layout for these reports, so the data holds no layout to show. Instica does not fill the gap with a guess; the report-format page records what is still open. When the layout is published, Instica prepares the file in it from your measured and estimated quantities, and you upload it yourself.

Open the Belgium report-format page

<a id="prepare"></a>

## Preparing before the date

1. Check whether you have to register at all, and with whom, before the registration date arrives; the first report cannot be filed without it.
2. Count the packaging you place on the market in the period the date covers. Weigh a sample of each pack, record the material of each part and note where each weight comes from: measured, supplied by your supplier, estimated or declared.
3. Group the weights the way the recipient groups them. The report-format page for this place lists the columns, the units and the rounding the file expects.
4. Estimate the fee from the published rate schedule, if the programme charges by weight or material, and keep the working so you can explain every figure.
5. Read the source quote under the date once more, because the programme can change a day or a period between reviews.
6. Sign in to the official portal yourself, check the prepared file and submit it. Instica stores no portal credentials and files nothing for you.

<a id="calendar"></a>

## Add these dates to your calendar

3 of the 5 verified dates for Belgium have a day in the source and are in the calendar feed. Subscribe once and your calendar adds new dates after each review. Every event carries the source address of the date, so you can open the page the date comes from. Entries without a day stay on this page.

Interactive tool: Deadline calendar feed (ICS) (works on the web page)

<a id="faq"></a>

## Questions about Belgium EPR deadlines

### <a id="faq-1"></a>When is the Belgium EPR report due?

The data lists these report dates for Belgium: 28 February for packaging put on the market the previous year; 1 June each year, for the preceding full calendar year. Read the period each one covers in the table above, and open the source to confirm the day before you file.

### <a id="faq-2"></a>Which period does a Belgium deadline cover?

The sources describe these periods: previous calendar year. A report is usually filed after the period it covers ends, so the date and the period are different things and both are shown.

<a id="faq-general"></a>

## Frequently asked questions

### <a id="faq-1-question"></a>Does Instica submit the report for me?

No. Instica measures, estimates and prepares the figures and the file. You sign in to the official portal, check the file and submit it yourself, and Instica never stores your portal credentials.

### <a id="faq-2-question"></a>How do I add the Belgium dates to my calendar?

Use the calendar block on this page: download the file or subscribe with the feed address. Each event has the day, the kind of date and the address of the source. Dates that the source gives only as a month or in words are not in the feed.

### <a id="faq-3"></a>What if a source changes a date after this review?

The source wins. Every entry shows the day it was retrieved. Check the source address before you act, and use the next review of this page for the change.

<a id="estimate"></a>

## How to read this page

> **Estimate**: Instica measures, estimates and prepares. Every date and layout on this page comes from the source named beside it and is shown as published on the retrieval date; it can change, so check the source before you act. You sign and submit each report yourself in the regulator or programme portal. Instica stores no portal credentials and files nothing for you. This page is information, not legal advice.

<a id="epr-cite-facts"></a>

## Facts on this page

Each fact is a self-contained sentence with its source. Link to a fact with its anchor.

- <a id="ppwr-authorised-representative-kind"></a>Belgium: the source at eur-lex.europa.eu lists a registration deadline. [#ppwr-authorised-representative-kind](#ppwr-authorised-representative-kind)
  Value: registration · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: shall appoint, by written mandate, an authorised representative for the extended producer responsibility in each Member State where (en)
- <a id="ppwr-authorised-representative-date"></a>Belgium: the registration deadline is August 12, 2026 (eur-lex.europa.eu, retrieved September 29, 2026). [#ppwr-authorised-representative-date](#ppwr-authorised-representative-date)
  Value: August 12, 2026 · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: shall appoint, by written mandate, an authorised representative for the extended producer responsibility in each Member State where (en)
- <a id="ppwr-authorised-representative-notes"></a>Belgium: the source notes for the registration deadline: PPWR Art 45(3): a producer selling directly to end users in another Member State (Art 3(1)(15)(c),(d)) must appoint an authorised representative for EPR in each Member State where it first makes packaging available, other than its own. Registration also required (Art 44(2),(4)). Instica never acts as authorised representative. (eur-lex.europa.eu). [#ppwr-authorised-representative-notes](#ppwr-authorised-representative-notes)
  Value: PPWR Art 45(3): a producer selling directly to end users in another Member State (Art 3(1)(15)(c),(d)) must appoint an authorised representative for EPR in each Member State where it first makes packaging available, other than its own. Registration also required (Art 44(2),(4)). Instica never acts as authorised representative. · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: shall appoint, by written mandate, an authorised representative for the extended producer responsibility in each Member State where (en)
- <a id="ppwr-application-kind"></a>Belgium: the source at eur-lex.europa.eu lists a date of another kind. [#ppwr-application-kind](#ppwr-application-kind)
  Value: other · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="ppwr-application-date"></a>Belgium: the other date is August 12, 2026 (eur-lex.europa.eu, retrieved September 29, 2026). [#ppwr-application-date](#ppwr-application-date)
  Value: August 12, 2026 · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="ppwr-application-notes"></a>Belgium: the source notes for the other date: Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it. (eur-lex.europa.eu). [#ppwr-application-notes](#ppwr-application-notes)
  Value: Regulation (EU) 2025/40 (PPWR) applies from this date; national EPR rules continue alongside it. · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: It shall apply from 12 August 2026. (en)
- <a id="declaration-amend-2025-kind"></a>Belgium: the source at fostplus.be lists a date of another kind. [#declaration-amend-2025-kind](#declaration-amend-2025-kind)
  Value: other · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Exceptionally, you can still amend your 2025 declaration until 15 September this year. (en)
- <a id="declaration-amend-2025-date"></a>Belgium: the other date is September 15, 2026 (fostplus.be, retrieved September 29, 2026). [#declaration-amend-2025-date](#declaration-amend-2025-date)
  Value: September 15, 2026 · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Exceptionally, you can still amend your 2025 declaration until 15 September this year. (en)
- <a id="declaration-amend-2025-notes"></a>Belgium: the source notes for the other date: Exceptional window to amend the 2025 declaration. (fostplus.be). [#declaration-amend-2025-notes](#declaration-amend-2025-notes)
  Value: Exceptional window to amend the 2025 declaration. · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Exceptionally, you can still amend your 2025 declaration until 15 September this year. (en)
- <a id="annual-declaration-kind"></a>Belgium: the source at fostplus.be lists a report deadline. [#annual-declaration-kind](#annual-declaration-kind)
  Value: report · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year. (en)
- <a id="annual-declaration-rule"></a>Belgium: the report deadline follows this rule: 28 February for packaging put on the market the previous year (fostplus.be, retrieved September 29, 2026). [#annual-declaration-rule](#annual-declaration-rule)
  Value: 28 February for packaging put on the market the previous year · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year. (en)
- <a id="annual-declaration-period"></a>Belgium: the report deadline covers previous calendar year (fostplus.be). [#annual-declaration-period](#annual-declaration-period)
  Value: previous calendar year · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year. (en)
- <a id="annual-declaration-notes"></a>Belgium: the source notes for the report deadline: Declaration via the MyFost portal. (fostplus.be). [#annual-declaration-notes](#annual-declaration-notes)
  Value: Declaration via the MyFost portal. · Source: https://www.fostplus.be/en/members/declaration · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year. (en)
- <a id="ppwr-annex-ix-annual-kind"></a>Belgium: the source at eur-lex.europa.eu lists a report deadline. [#ppwr-annex-ix-annual-kind](#ppwr-annex-ix-annual-kind)
  Value: report · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="ppwr-annex-ix-annual-rule"></a>Belgium: the report deadline follows this rule: 1 June each year, for the preceding full calendar year (eur-lex.europa.eu, retrieved September 29, 2026). [#ppwr-annex-ix-annual-rule](#ppwr-annex-ix-annual-rule)
  Value: 1 June each year, for the preceding full calendar year · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="ppwr-annex-ix-annual-notes"></a>Belgium: the source notes for the report deadline: PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending. (eur-lex.europa.eu). [#ppwr-annex-ix-annual-notes](#ppwr-annex-ix-annual-notes)
  Value: PPWR Art 44(7) annual submission of Annex IX Part B information to the register authority; national implementation of the register is pending. · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: by 1 June for each full preceding calendar year (en)
- <a id="registry"></a>Belgium: producers register with EPRiBEL producer register (formerly IVC-CIE); Fost Plus registers members collectively. [#registry](#registry)
  Value: EPRiBEL producer register (formerly IVC-CIE); Fost Plus registers members collectively · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Companies that are not members of Fost Plus or another recognised EPR organisation can register directly through EPRiBEL (en)
- <a id="who-registers"></a>Belgium: the party that registers is described as Members: Fost Plus on their behalf; non-members register directly through EPRiBEL. [#who-registers](#who-registers)
  Value: Members: Fost Plus on their behalf; non-members register directly through EPRiBEL · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Companies that are not members of Fost Plus or another recognised EPR organisation can register directly through EPRiBEL (en)
- <a id="registration-identifier"></a>Belgium: registration yields an identifier called official registration number via Fost Plus (MyFost). [#registration-identifier](#registration-identifier)
  Value: official registration number via Fost Plus (MyFost) · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: Companies that are not members of Fost Plus or another recognised EPR organisation can register directly through EPRiBEL (en)
- <a id="organisation-model"></a>Belgium: producers meet the duty through one of several producer responsibility organisations. [#organisation-model](#organisation-model)
  Value: several competing organisations · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: This representative must (1) be established in Belgium and (2) be registered with EPRiBEL. (en)
- <a id="organisation-names"></a>Belgium: the organisations named in the data are Fost Plus (household), Valipac (industrial). [#organisation-names](#organisation-names)
  Value: Fost Plus (household), Valipac (industrial) · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: This representative must (1) be established in Belgium and (2) be registered with EPRiBEL. (en)
- <a id="organisation-membership"></a>Belgium: membership of an organisation is not required. [#organisation-membership](#organisation-membership)
  Value: no · Source: https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you · Retrieved: September 29, 2026 · Status: verified
  Verbatim quote: This representative must (1) be established in Belgium and (2) be registered with EPRiBEL. (en)
- <a id="format-pending"></a>Belgium: the report file layout is not yet published, reason: The sources read describe the obligation but not a declaration file layout (columns, codes, units): no downloadable template or documented upload format was found. The worksheet in this file is Instica's own working layout, not the recipient's. [#format-pending](#format-pending)
  Value: not yet published · Source: https://valipac.academy/en/modules/gaining-a-better-understanding-of-the-legislation/belgian-legislative-framework/ · Retrieved: September 30, 2026 · Status: not yet published
  Verbatim quote: The new version of the Cooperation Agreement has been in force since 5 March 2020. (en)
- <a id="deadline-count"></a>Belgium: 5 verified deadlines in the bundle (reviewed September 29, 2026). [#deadline-count](#deadline-count)
  Value: 5 · Source: https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng · Retrieved: September 29, 2026 · Status: verified

## Related pages

### Explore packaging EPR

- [Packaging EPR europe](https://instica.com/epr/europe)

### More for this jurisdiction

- [Belgium EPR fees 2026](https://instica.com/epr/belgium/fees/2026)
- [Belgium EPR fee rates 2027](https://instica.com/epr/belgium/fees/2027)
- [Do I owe EPR fees Belgium](https://instica.com/epr/belgium/do-i-owe)
- [Belgium EPR fee calculator](https://instica.com/epr/belgium/fee-calculator)
- [Sell on Amazon EPR Belgium](https://instica.com/epr/for/amazon/belgium)
- [Belgium EPR do I have to register](https://instica.com/epr/belgium/updates)
- [EPR fees for bags Belgium](https://instica.com/epr/bag/belgium)
- [Cans packaging EPR Belgium](https://instica.com/epr/can/belgium)
- [Cartons packaging EPR Belgium](https://instica.com/epr/carton/belgium)
- [EPR fees for jars Belgium](https://instica.com/epr/jar/belgium)
- [Mailers packaging EPR Belgium](https://instica.com/epr/mailer/belgium)
- [Pouches EPR fees Belgium](https://instica.com/epr/pouch/belgium)

### Related pages

- [British Columbia EPR reporting format](https://instica.com/epr/british-columbia/deadlines)
- [Paper EPR fees Bulgaria](https://instica.com/epr/bulgaria/deadlines)
- [California EPR bill](https://instica.com/epr/california/deadlines)
- [Colorado EPR legislation](https://instica.com/epr/colorado/deadlines)
- [EPR deadlines 2025](https://instica.com/epr/deadlines)
- [EPR in Germany](https://instica.com/epr/germany/deadlines)

## Sources

1. eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Status: verified
   > shall appoint, by written mandate, an authorised representative for the extended producer responsibility in each Member State where (en)
2. eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Status: verified
   > It shall apply from 12 August 2026. (en)
3. fostplus.be (https://www.fostplus.be/en/members/declaration), Retrieved: September 29, 2026, Status: verified
   > Exceptionally, you can still amend your 2025 declaration until 15 September this year. (en)
4. fostplus.be (https://www.fostplus.be/en/members/declaration), Retrieved: September 29, 2026, Status: verified
   > The deadline for the annual declaration is always 28 February for the packaging that you put on the market the previous year. (en)
5. eur-lex.europa.eu (https://eur-lex.europa.eu/eli/reg/2025/40/oj/eng), Retrieved: September 29, 2026, Status: verified
   > by 1 June for each full preceding calendar year (en)
6. fostplus.be (https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you), Retrieved: September 29, 2026, Status: verified
   > Companies that are not members of Fost Plus or another recognised EPR organisation can register directly through EPRiBEL (en)
7. fostplus.be (https://www.fostplus.be/en/blog/ppwr-insights-8-mandatory-registration-in-producer-register-fost-plus-handles-it-for-you), Retrieved: September 29, 2026, Status: verified
   > This representative must (1) be established in Belgium and (2) be registered with EPRiBEL. (en)
8. valipac.academy (https://valipac.academy/en/modules/gaining-a-better-understanding-of-the-legislation/belgian-legislative-framework/), Retrieved: September 30, 2026, Status: not yet published
   > The new version of the Cooperation Agreement has been in force since 5 March 2020. (en)

## Cite this page

Instica, “Belgium EPR 2027”, https://instica.com/epr/belgium/deadlines, last verified 2026-09-30, dataset v1-281284b7e7c1, CC-BY-4.0.

- Canonical URL: https://instica.com/epr/belgium/deadlines
- Last verified: September 30, 2026
- Last changed: September 30, 2026
- Dataset version: v1-281284b7e7c1
- Licence: Reuse is allowed under CC-BY-4.0 with credit to Instica and a link to this page.
- Machine-readable versions: https://instica.com/epr/belgium/deadlines.md · https://instica.com/epr/belgium/deadlines.json
