Skip to main content

Alberta vs Yukon EPR: Rules Compared

Last verified

Alberta and Yukon both run packaging EPR, but the rules differ. Yukon exempts only producers below the lower revenue floor, CA$1,000,000 against CA$1,500,000 in Alberta. Yukon asks for its first annual report earlier, on May 31 against June 30 in Alberta. Yukon publishes the higher per-kilogram fee in 5 of 5 shared material classes.

Paired bars comparing the cheapest published packaging fee per kilogram in Alberta and Yukon for each shared material.Alberta / Yukon (per kg · CAD): paper and board: Alberta 0.48, Yukon 1.36; plastic: Alberta 1.76, Yukon 5.88; glass: Alberta 0.41, Yukon 1.22; aluminium: Alberta 0.98, Yukon 4.55; steel: Alberta 0.62, Yukon 2.11AlbertaYukonper kg · CAD0246paper and board0.481.36plastic1.765.88glass0.411.22aluminium0.984.55steel0.622.11
Source: Alberta and Yukon primary sources, retrieved 2026-11-05

Alberta and Yukon side by side

4 of 9 rows have a verified figure on each side of Alberta and Yukon; a cell reads “not yet published” when a side has none, and an exemption row reads “none recorded; see thresholds” when no exemption is on record.

Alberta and Yukon: the measures both programmes publish
MeasureAlbertaYukonStricter
Registration dutynot yet publishednot yet publishedNot comparable
Producer organisationnot yet publishedone producer responsibility organisationNot comparable
Lowest revenue exemptionCA$1,500,000CA$1,000,000Yukon
Lowest weight exemptionnone recorded; see thresholds1 tonneNot comparable
First annual report dateJune 30May 31Yukon
Published penaltiesnot yet publishednot yet publishedNot comparable
Report filecsvcsvNot comparable
Paper fee, cheapest matched rate48 cents per kilogram136 cents per kilogramYukon
Plastic fee, cheapest matched rate176 cents per kilogram588 cents per kilogramYukon

The lowest revenue exemption is CA$1,500,000 in Alberta and CA$1,000,000 in Yukon. Yukon therefore reaches smaller sellers: a business with revenue between the two lines is exempt in Alberta but still in scope in Yukon.

The earliest annual report date is June 30 in Alberta and May 31 in Yukon, 30 days apart. Yukon leaves less time to prepare, so its data has to be ready first.

Across 5 shared material classes, Yukon publishes the higher cheapest per-kilogram fee in 5, and Alberta in 0. A higher fee is not the same as a stricter rule; it is simply a larger published number per kilogram.

Who runs the programme in Alberta and Yukon

Who collects and who the producer files with, in Alberta and then Yukon.

Alberta and Yukon: how each programme is set up
AspectAlbertaYukon
RegimeExtended Producer Responsibility Regulation, Environmental Protection and Enhancement Act (packaging, paper products)Extended Producer Responsibility Regulation, OIC 2024/19 (effective 2024-01-25; launched 2025-11-01)
RegulatorAlberta Recycling Management Authority (ARMA)Government of Yukon, Ministry of the Environment
Producers obligatedYesYes
Producer organisationnot yet publishedone producer responsibility organisation: Circular Materials; membership required
Revenue counted asgross revenue inside the jurisdiction, CAD, yeargross revenue inside the jurisdiction, CAD, completed year
Who counts as the producerprimary: brand owner, importer, seller; secondary: brand owner, importer, seller; shipping: brand owner, importer, seller; tertiary: brand owner, importer, sellerother: brand owner, importer, seller, online marketplace; primary: brand owner, importer, seller, online marketplace; secondary: brand owner, importer, seller, online marketplace; service: seller, online marketplace; shipping: brand owner, importer, seller, online marketplace; tertiary: brand owner, importer, seller, online marketplace

Where one side has not yet published how its producer organisations work, this page says so rather than assuming it matches the other side. A seller in both should check the open item before relying on the comparison.

What Alberta and Yukon cover, side by side

Each row below is one published feature of the two programmes; a cell reads “not yet published” when Alberta or Yukon has no verified entry for it in the dataset.

Scope, producer duties, categories, labelling and targets, Alberta and Yukon
AspectAlbertaYukon
Producer duty: primary packagingbrand_owner; importer; sellerbrand_owner; importer; seller; marketplace
Producer duty: secondary packagingbrand_owner; importer; sellerbrand_owner; importer; seller; marketplace
Producer duty: tertiary packagingbrand_owner; importer; sellerbrand_owner; importer; seller; marketplace
Producer duty: shipping packagingbrand_owner; importer; sellerbrand_owner; importer; seller; marketplace
Reporting categories33, material category36, material category
Exemption 1Producers under CAD 1,500,000 Alberta revenue are exemptCharity, under CAD 1,000,000 Yukon revenue or under one tonne
Producer duty: service packagingnot yet publishedseller; marketplace
Producer duty: other packagingnot yet publishedbrand_owner; importer; seller; marketplace

Thresholds and exemptions in Alberta and Yukon

Every verified threshold Alberta and Yukon publish, as each states it.

Verified thresholds in Alberta and Yukon
PlaceMeasureAmountEffectBasis as published
AlbertarevenueCA$1,500,000exempt belowAlberta revenue
Albertapackaging tonnage9 tonnesreduced dutyresidential supply per year (9 t paper; 2 t rigid plastic; 2 t flexible plastic; 1 t glass; 1 t metal)
YukonrevenueCA$1,000,000exempt belowrevenue in Yukon
Yukonpackaging tonnage1 tonneexempt belowsupply

Alberta exemption: Producers under CAD 1,500,000 Alberta revenue are exempt It does not have to be applied for.

Yukon exemption: Charity, under CAD 1,000,000 Yukon revenue or under one tonne It does not have to be applied for.

Read the basis column first: the same amount can exempt a producer in one programme and only simplify its report in another.

The lowest revenue exemption is CA$1,500,000 in Alberta and CA$1,000,000 in Yukon. Yukon therefore reaches smaller sellers: a business with revenue between the two lines is exempt in Alberta but still in scope in Yukon.

Fees per kilogram for shared materials

5 material classes have a published rate on both sides; each row shows the cheapest rate that fits the class.

Cheapest published rate per kilogram by material class, Alberta and Yukon
Material classAlberta (CAD per kg)Yukon (CAD per kg)Higher fee
paper and board48 cents per kilogram136 cents per kilogramYukon
plastic176 cents per kilogram588 cents per kilogramYukon
glass41 cents per kilogram122 cents per kilogramYukon
aluminium98 cents per kilogram455 cents per kilogramYukon
steel62 cents per kilogram211 cents per kilogramYukon

Scaling the cheapest published rate by weight shows what the gap between Alberta and Yukon amounts to for a given tonnage of one material. The amounts are the rate times the weight, nothing added.

Fee at the cheapest published rate for 1 to 100,000 kilograms, Alberta and Yukon
Material classKilogramsAlberta fee (CAD)Yukon fee (CAD)Yukon minus Alberta (CAD)
paper and board1CA$0.48CA$1.36+CA$0.88
paper and board10CA$4.80CA$13.60+CA$8.80
paper and board100CA$48.00CA$136.00+CA$88.00
paper and board1,000CA$480.00CA$1,360.00+CA$880.00
paper and board10,000CA$4,800.00CA$13,600.00+CA$8,800.00
paper and board100,000CA$48,000.00CA$136,000.00+CA$88,000.00
plastic1CA$1.76CA$5.88+CA$4.12
plastic10CA$17.60CA$58.80+CA$41.20
plastic100CA$176.00CA$588.00+CA$412.00
plastic1,000CA$1,760.00CA$5,880.00+CA$4,120.00
plastic10,000CA$17,600.00CA$58,800.00+CA$41,200.00
plastic100,000CA$176,000.00CA$588,000.00+CA$412,000.00
glass1CA$0.41CA$1.22+CA$0.81
glass10CA$4.10CA$12.20+CA$8.10
glass100CA$41.00CA$122.00+CA$81.00
glass1,000CA$410.00CA$1,220.00+CA$810.00
glass10,000CA$4,100.00CA$12,200.00+CA$8,100.00
glass100,000CA$41,000.00CA$122,000.00+CA$81,000.00
aluminium1CA$0.98CA$4.55+CA$3.57
aluminium10CA$9.80CA$45.50+CA$35.70
aluminium100CA$98.00CA$455.00+CA$357.00
aluminium1,000CA$980.00CA$4,550.00+CA$3,570.00
aluminium10,000CA$9,800.00CA$45,500.00+CA$35,700.00
aluminium100,000CA$98,000.00CA$455,000.00+CA$357,000.00
steel1CA$0.62CA$2.11+CA$1.49
steel10CA$6.20CA$21.10+CA$14.90
steel100CA$62.00CA$211.00+CA$149.00
steel1,000CA$620.00CA$2,110.00+CA$1,490.00
steel10,000CA$6,200.00CA$21,100.00+CA$14,900.00
steel100,000CA$62,000.00CA$211,000.00+CA$149,000.00

Both schedules are in CAD, so the figures compare directly.

Yukon: the 2027 fee schedule of Circular Materials Yukon, effective January 1, 2027, is the source of the per-kilogram rates used on this page.

Alberta: the 2027 fee schedule of Circular Materials Alberta (ARMA PPP), effective January 1, 2027, is the source of the per-kilogram rates used on this page.

Alberta 2027: the category “Boxboard and Other Paper Packaging” is published at 48 cents per kilogram.

Alberta 2027: the category “LDPE/HDPE Film” is published at 176 cents per kilogram.

Alberta 2027: the category “Clear Glass” is published at 41 cents per kilogram.

Alberta 2027: the category “Aluminum Food Containers” is published at 98 cents per kilogram.

Alberta 2027: the category “Other Steel Containers and Packaging” is published at 62 cents per kilogram.

Yukon 2027: the category “Boxboard and Other Paper Packaging” is published at 136 cents per kilogram.

Yukon 2027: the category “LDPE/HDPE Film” is published at 588 cents per kilogram.

Yukon 2027: the category “Clear Glass” is published at 122 cents per kilogram.

Yukon 2027: the category “Aluminum Food Containers” is published at 455 cents per kilogram.

Yukon 2027: the category “Other Steel Containers and Packaging” is published at 211 cents per kilogram.

Real packs usually land in a dearer category, so use the calculator for Alberta and Yukon.

Deadlines in Alberta and Yukon

Each verified date, with the period it covers when one is given.

Verified deadlines in Alberta and Yukon
PlaceKindDateCovers
AlbertareportJune 30preceding calendar year (January 1 to December 31)
Albertarate publicationMarch 8current calendar year's ARMA oversight fees (based on supply data from two years earlier)
AlbertapaymentApril 8current calendar year's ARMA oversight fees
AlbertaotherOctober 1, 2026not yet published
YukonreportMay 31the previous calendar year
YukonreportJuly 1the previous calendar year
Yukonreportevery three years, on or before September 1, beginning with the second annual report submitted for the program; not annualverifies the annual report most recently submitted for the program

The earliest annual report date is June 30 in Alberta and May 31 in Yukon, 30 days apart. Yukon leaves less time to prepare, so its data has to be ready first.

Penalties in Alberta and Yukon

What each side has published; a side without an amount says so.

Report formats in Alberta and Yukon

How the report file for Alberta compares with the one for Yukon.

Report file layouts for Alberta and Yukon
AspectAlbertaYukon
LayoutAlberta PPP producer annual report Fee-year categories, reviewed 2026-09-29Yukon steward annual report Fee-year categories, reviewed 2026-09-29
RecipientAlberta Recycling Management AuthorityGovernment of Yukon / Circular Materials
How it is submittedARMA producer portalWeRecycle Portal
File typecsvcsv
Encodingutf-8utf-8
Delimiter,,
Decimal separator.
Columns44
Required columns4 of 44 of 4
Weight unitkgkg
Period basiscalendar yearcalendar year

The two layouts share a file type and a delimiter, but each programme names its own columns and categories, so one file cannot be sent to both programmes. Each report is built from the same underlying measurements and exported separately.

Which to plan for first, Alberta or Yukon

Plan around the earlier report date first. Yukon asks for its first annual report on May 31, before Alberta, so its data has to be ready first.

Check the exemption thresholds before anything else. Yukon reaches smaller sellers than Alberta, so a seller that is exempt in Alberta may still have to register in Yukon.

Questions about comparing these two programmes

Is Alberta or Yukon stricter on packaging EPR?

Yukon exempts only producers below the lower revenue floor, CA$1,000,000 against CA$1,500,000 in Alberta. Yukon asks for its first annual report earlier, on May 31 against June 30 in Alberta. Yukon publishes the higher per-kilogram fee in 5 of 5 shared material classes.

Do I register in both Alberta and Yukon?

Alberta has not yet published its registration duty. Yukon has not yet published its registration duty.

How do the fees per kilogram compare in Alberta and Yukon?

Across 5 shared material classes, Yukon publishes the higher cheapest per-kilogram fee in 5, and Alberta in 0. A higher fee is not the same as a stricter rule; it is simply a larger published number per kilogram.

Which deadline comes first, Alberta or Yukon?

The earliest annual report date is June 30 in Alberta and May 31 in Yukon, 30 days apart. Yukon leaves less time to prepare, so its data has to be ready first.

How these figures are made

Our reviewers.

Sources

  1. albertarecycling.ca retrieved
    Original wording: PPP Producers shall submit an annual report to the Authority no later than June 30th each year.
  2. files.albertarecycling.ca: EPR Single‑Use Products Packaging and Paper Products Bylaws retrieved
    Original wording: has an annual gross revenue in Alberta less than one million and five hundred thousand dollars $1,500,000.
    Original wording: less than each of the amounts listed for the following materials: (a) 9 tonnes of paper per calendar year; (b) 2 tonnes of rigid plastic
    Original wording: PPP Producers shall submit an annual report to the Authority no later than June 30th each year.
    Original wording: A PPP Producer must provide, by October 1, 2026, to single-family dwellings in Registered Communities that were not receiving recycling service
  3. kings-printer.alberta.ca: 2022 194 retrieved
    Original wording: the producer is (a) the brand holder of the designated material, if the brand holder is resident in Canada,
  4. albertarecycling.ca: EPR Oversight Fee Guide retrieved
    Original wording: By March 8 Notice of Final Oversight Fees posted (minimum of 30 days prior to invoicing) April 8 Invoicing of Oversight Fees
  5. circularmaterials.ca: Circular Materials Report to Producers 2025 retrieved
    Original wording: Newspapers 83 84 -1.2%
    Original wording: Average fee rate (cents per kg) (Total fee budget/supply tonnes) 227 c/kg
  6. laws.yukon.ca: 2024 0019 retrieved
    Original wording: On or before May 31 of each year, a steward must
    Original wording: completed year of less than $1,000,000,
    Original wording: (A) the brand holder of the product, if the brand holder is resident in Canada,
    Original wording: imported into or supplied in Yukon in the most recently completed year less than one tonne of designated materials
    Original wording: On or before May 31 of each year, a steward must submit the records described in paragraphs (1)(d) to (f)
    Original wording: On or before July 1 of each year, the operator of a stewardship program must
    Original wording: Every three years, the operator of a program must submit an audit report on or before September 1
  7. knowledge.werecycle.ca: Report to Producers 2026 OCT15 retrieved
    Original wording: Circular Materials in Alberta Fee Schedule (Cents/Kg)
    Original wording: Boxboard and Other Paper Packaging 48 40 20.0%
    Original wording: LDPE/HDPE Film 176 198 -11.1%
    Original wording: Clear Glass 41 45 -8.9%
    Original wording: Aluminum Food Containers 98 77 27 .3%
    Original wording: Other Steel Containers and Packaging 62 69 -10.1%
    Original wording: Circular Materials in the Yukon Fee Schedule (Cents/Kg)
    Original wording: Boxboard and Other Paper Packaging 136 127 7.1 %
    Original wording: LDPE/HDPE Film 588 566 3.9%
    Original wording: Clear Glass 122 116 5.2%
    Original wording: Aluminum Food Containers 455 410 11.0%
    Original wording: Other Steel Containers and Packaging 211 191 10.5%
Model both: Alberta and YukonCompare another pair

The free plan is enough to start. We estimate and prepare; you sign and submit.